Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Williams Parkway Operations Centre  

Williams Parkway Operations Centre

Brampton, Canada

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by RDH Architects

Add To Collection Add to Collection

Centennial College Story Arts Campus Library

Add To Collection Add to Collection

Guildwood GO Station

Add To Collection Add to Collection

Newmarket Operations Centre

Add To Collection Add to Collection

Guelph Market Square Pavillion

Add To Collection Add to Collection

Bloor/Gladstone District Library

Add To Collection Add to Collection

Port Credit Library

Add To Collection Add to Collection

Hamilton Central Library and Farmers' Market

Add To Collection Add to Collection

Idea Exchange Old Post Office

Add To Collection Add to Collection

Scott Street Interlocking Signal Tower Generator

Add To Collection Add to Collection

Springdale Library and Komagata Maru Park

Add To Collection Add to Collection

Waterdown Library and Civic Centre

Williams Parkway Operations Centre

Brampton, Canada

STATUS
Built
YEAR
2017
SIZE
100,000 sqft - 300,000 sqft
This 19.6 acre campus is the primary response point for municipal infrastructure design, maintenance and repair for the City of Brampton, Canada’s 9th largest city. The design emphasizes employee well-being and public transparency, and contains three main components; an administrative headquarters, works building, and works yard. The project was built in two phases while accommodating full operations on an existing, partially overlapping works yard site.

The 190,000 sf administrative headquarters is LEED Gold Certified, and conceived as a collection of crisp glass and metal volumes linked together by a 500 foot long, two storey wood-lined atrium that gestures to the street with a dramatic cantilevered board room. The works building is LEED Silver Certified, and includes the weather event control centre, muster and change facilities, workshops, a fleet repair and maintenance garage, and extensive storage with covered loading. The works yard contains a vehicle wash building, a salt, sand and equipment storage shed, and a fuelling centre.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team