Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Velodrome Odense  

Velodrome Odense

Odense, Denmark

Project Featured on Jun 10, 2015
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by MIKKELSEN Architects

Add To Collection Add to Collection

Steno Diabetes Center Copenhagen

Add To Collection Add to Collection

LABORATORY AND LOGISTICS BUILDING

Add To Collection Add to Collection

Damesalen

Add To Collection Add to Collection

Faculty Library of Humanities

Add To Collection Add to Collection

Rambøll Head Office

Add To Collection Add to Collection

UDBETALING DENMARK

Velodrome Odense

Odense, Denmark

Project Featured on Jun 10, 2015
STATUS
Built
YEAR
2014
SIZE
25,000 sqft - 100,000 sqft
The project is located west of Odense city center, in a suburban open and green area where trees as well as existing vegetation surround the existing outdoor cycle track and associated buildings.

The project describes a solution with the enclosure of a 250 meter long cycle track, as well as establishing a new timber cycle track in combination with a 200 m running track and field event facilities in the central area.

The building is located within the existing track’s geometry – this will help emphasize the area’s landscape character, while at the same time all existing vegetation is arranged in relation to and supports the existing track’s geometry.
Thus the new building will right from the start be surrounded by planting. The building is located as far south as possible in the existing track’s geometry. This location will make the building visible to passersby. Surplus excavated earth will be used as fill in the area to the north of the building. Additionally the open area on the site will benefit greatly as it will appear as a larger combined area.

The biggest challenge with regard to the structural design is the need to design a structure that can span over a large column-free area while being both the lightest and most structurally and economically effective solution. During the first stages of the design process it became clear that the best way to achieve these goals was to use a membrane structure in combination with a supporting structure of steel. A membrane functions simultaneously as structure and cladding for the roof. This reduces both weight, costs and the environmental impact of the structure.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team