Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Nepal Project  

Nepal Project

Nepal

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Shigeru Ban Architects

Add To Collection Add to Collection

Kentucky Owl Park

Add To Collection Add to Collection

Aspen Art Museum

Add To Collection Add to Collection

Terrace House

Add To Collection Add to Collection

Window House

Add To Collection Add to Collection

Tamedia Office Building

Add To Collection Add to Collection

Solid Cedar House

Add To Collection Add to Collection

Oita Prefectural Art Museum (OPAM)

Add To Collection Add to Collection

Aspen Art Museum

Add To Collection Add to Collection

Villa at Sengokubara

Add To Collection Add to Collection

Centre Pompidou Metz

Add To Collection Add to Collection

Rietberg Museum Temporary Pavilion

Add To Collection Add to Collection

Madrid Paper Pavilion

Add To Collection Add to Collection

Camper House of Shoes

Nepal Project

Nepal

STATUS
Concept
This system can be assembled by connecting modular wooden frames (3ft x 7ft or 90cm x 210cm) and infilling with rubble bricks. This simple construction method enables anyone to assemble the wooden frames very quickly and if a roof (a truss made of local paper tubes) is secured on top, and the wooden structure covered with a plastic sheet, people can immediately begin to inhabit the shelters. Afterwards, people can stack the rubble bricks inside the wooden frames and slowly complete the construction themselves. The first prototype is to be constructed by end of August.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team